Wednesday 17 November 2010

Second Trailer Analysis

NIGHTMARE ON ELM STREET (2010)


Wednesday 10 November 2010

FINAL CAST LIST

Filming Schedule

In preparation of our filming we planned our time and made a note of when our actors were availible. This meant we could get the most out of the use of our location. We made a list of the shots we would do on each day and who we required to do them.




Monday 1 November 2010

Practice Filming

Before we started to film, we wanted to familiarise ourselves with the equipment and also the shots we planned to use. We practise several of the different techniques around school and these are the results:

On Location

My group and visted our location to check it was suitable for filming and to get permission for its use. We will be using the Sacred Heart School in Hammersmith as it is has old, gothic arcitecture and, as a catholic school, religious icononography. This makes it much more appropriate than using our own school's building.